|
Deck glued in place
|
Used drywall screws to hold down the deck and mast partner while the epoxy dried. Screws where located nearest the edges as possible and adjusted so a fair surface was achieved. Adjusting the screws was necessary since the glue blocks near the bow were a bit lower than they should have been. Epoxy with filler was used to bridge the gap. An added stiffner can just be seen on the inner side of the spinnaker hole. There is another one on the forward side.
|
|